it's been awhile since the last photo update on the project, so I'll post the latest progress.
Sponsor has finished up the headers/crossover/downpipe for me on his mock-up engine and they should be here by Monday. All that's left to have it rolling is drill the drain line into the oil pan, weld in the wastegate flange, and coat/wrap the headers/downpipe with a little heat shielding in strategic locations. Then the painful tuning process. Wish me luck :)